Announcement for the extension of document submission for the prequalification of 63 and 132 kv GIS equipments manufactures.
Following previous announcement and due to the request of anumber of interested companies , the previous deadline for the submission of relevant prequalification document has been extended to july 23,2003.

Invitation for Prequalification Process of Local and Foreign Manufacturers of 63 and 132KV Gas Insulated Switchgear Equipment to Participate in the Tender

Tavanir company intends to obtain and transfer technology and know – how for manufacturing of Gas Insulated Switchgear Equipments (including conventional GIS , HYBRIDS & … ) to local companies, along with purchasing GIS equipment for 30 substations (63 and 132KV). Therefore, all companies having necessary capability in this respect, are invited to submit the following documents and data before July 23,2003:

1- Products reference list with the name of customers

2- Products brochure

3- Foreign companies should mention their detailed experiences and history of technical cooperation in the field of GIS substations with other countries, including the country and company name and conditions and circumstances of the technical collaboration.

 4- Local companies should mention their experience regarding technology and the conditions of know-how transfer, including the country and company name.

5- Name and practical experience of local cooperator and/or companies . “For foreign companies”

 6- Name and practical experience of foreign cooperator and/or companies “For local companies”

7- In case of joint – ventured participation of several local and foreign companies , the name and specifications of the leader shall be mentioned.

- Requirements from local companies for participation in the tender.

 i) Having good record and reputation in Electrical power industry or similar industrial activities.

 ii) Having well known foreign collaborator, in the field of manufacturing of gas insulated substation. The general procedure and contents of the perliminary memorandum of cooperation or equipment participation shall be provided.

- Requirements from foreign companies for participation in the tender

i) Having international record and reputation and relevant experience in the field of manufacturing of substations gas insulated equipment.

ii) Having continuous activity and up-to-date technology.

 iii) Having a well – know domestic partner is an advantage. For independent participation , a company has to be registered in Iran with respect to the related domestic rules. (the general procedure and contents of preliminary memorandum of cooperation or partnership with local side or establishment of new independent company should be submitted ) . After investigation and evaluation of practical and technical capability , the qualified companies will be invited to tender.

The following items will be considered as important factors in the evaluation of the proposals:

 1- Products’ price .

 2- Quality and specifications of products based on the rendered documents .

3- Investment share of the foreign side.

4- Schedule and plan for manufacturing of equipment in Iran.

 5- Level of technical cooperation including transfer of technology , license permission, technical support , providing latest technology and updating procedure and so on.

Considering the a/m, interested companies should submit the required information in three copies to the following address:

Deputy for Development and Economic Affairs, Tavanir company. Shahid Abasspour Ave., Vanak Sq,. Tehran, Iran.

Should you have any question, please contact “Ghods Niroo Consulting Engingeers” at:

Deputy for Substation Engineering Department, No.98 Ostad Motahari Ave., Tehran , Iran.

Tel: +98(21)8405540